Maintenance And Care Points For Mixers And Batching Systems

a. Transmission system

  • All transmission gears, reduction boxes, chains, etc. are filled with sufficient lubricating oil (grease) as required;
  • The sound of the transmission part is normal, and the reduction box and bearings are not hot or leaking;
  • The tightness of the triangular conveyor belt is appropriate (the middle can be pressed down 10-15mm, and the sinking of the middle of the transmission chain shall not exceed 20mm);
  • The wire rope has no major wear, the chuck and connection are firm, and there is grease (graphite calcium base) on the surface;
  • The brake and clutch have good performance, and the brake pads should be replaced when they are worn to a certain extent.

 

120m Stationary Concrete Plant001

 

b. Other lubricating parts

  • The shaft end seal of the mixer should be refueled at each start of the main engine or regularly as required to ensure the long-term normal operation of the oil seal structure;
  • Other refueling points such as each rotating wheel and track should be refueled regularly.

c. Mixing system

  • Check whether the mixing drum is running smoothly, and replace the liner and blades in time if they are damaged; clean the concrete stains in the mixer in time or regularly.

d. Installation, tightening and cleaning

  • The mainframe and bracket, loading bracket and other facilities must be firmly installed and connected;
  • The machine body, site and operating room must be clean;
  • No water should accumulate around the foundation, and water should be stored in the waterway during the freezing season.